Chevron – BOP – and LMRP Seafastening Frames

The Sea-fastening frames were designed with assistance from AME to create the installation plans, to ensure a smooth installation onboard the MODU. AME managed both the onshore fabrication and the offshore installation of the frames and worked closely with Atwood and Chevron to complete the works as required for the Wheatstone Project Schedule.

 

Website by The Right Group