ROV umbilical winch removal

AME assisted BHP, Atwood Oceanics & Subsea 7 with the removal of the ROV umbilical winch from the Falcon MODU including: Engineering solutions for weight reduction to bring reeler with the cranes WLL, creation of Engineered lift plans, removal of sea-fastening and offshore weighing of reeler with compression and tension load cells leading to the successful demobilisation of the winch.

 

Website by The Right Group