Gorgon Rig & Vessel Completion Interfaces

Chevron Australia engaged the services of AME to provide an Engineering, Procurement and Construction (EPC) service, to support their drilling and completions operations in the Gorgon gas field.

Project Profile:

Client:
Chevron
Location:
Gorgon gas field, off the Northwest coast of WA
Project Duration:
12 weeks

Project Summary:

AME’s support included sequence methodology, conceptual design, engineering, supply and installation of equipment interface steelwork and handling aids – enabling the Atwood Osprey rig and Farstad Far Saracen supply vessel, to complete operations.

AME’s scope of work included:

  • Sequence methodology for handling the HXT’s and other equipment from shore to seabed
  • Design, fabrication and installation of installation aids and interface steelwork