Fatigue Gusset Installation

AME was engaged by Diamond Offshore to install lower-hull-diagonal fatigue reinforcement plates onboard the Ocean Epoch.

Project Profile:

Client:
Diamond Offshore Drilling Inc.
Location:
Ocean Epoch, Darwin Harbour
Project Duration:
10 days
Date:
March 2003
Crew Size:
7

Project Summary:

AME’s scope of work encompassed the preparation of installation workpacks, supply of consumables and tools, provision of site labour, site supervision and preparation of the project MDR (Manufacturers Data Report).

AME mobilised personnel and equipment from Perth and Darwin.

Work entailed steelwork installation at the pontoon level of the rig. New steel was installed in 16 separate locations.

The installation works were made challenging by arduous environmental and physical constraints.