Sapura Acergy engaged AME to complete detailed design and drafting of a flexible lay system, for the Rockwater II.
Project Profile:
- Client:
- Sapura Acergy
- Location:
- Montara Field, Northwest Shelf
- Date:
- 12 weeks
Project Summary:
AME’s scope of work included:
- Developing a system that met all of SA’s installation requirements for the Montara campaign
- Design of all interfaces for the Rockwater II deck
- Development & design of a removable stern access platform, for installing buoyancy modules
- Installation of risers and umbilicals
- Design of the structure for installation onto the vessel, in a single lift
- Preparing all fabrication drawings for steelwork fabrication, in Asia
- Preparing all documentation for verification by marine warranty surveyor
Download Data Sheet