For the hook up of the Prelude LNG facility, Technip engaged AME to design and fabricate an integrated package that was installed on the Deep Orient MSV.
Project Profile:
- Client:
- Technip
- Project Duration:
- Less than 10 months
- Scope:
- Fabrication and Installation
Project Summary:
AME’s scope of work included:
- Conceptual design of all equipment to meet Prelude project requirements
- Detailed mechanical and structural design of equipment
- Third party review and approvals (DNV)
- Fabrication, assembly and testing
- Delivery and loadout in Singapore
- Fast turnaround and delivery schedule