Mooring Handling System

For the hook up of the Prelude LNG facility, Technip engaged AME to design and fabricate an integrated package that was installed on the Deep Orient MSV.

Project Profile:

Client:
Technip
Project Duration:
Less than 10 months
Scope:
Fabrication and Installation

Project Summary:

AME’s scope of work included:

  • Conceptual design of all equipment to meet Prelude project requirements
  • Detailed mechanical and structural design of equipment
  • Third party review and approvals (DNV)
  • Fabrication, assembly and testing
  • Delivery and loadout in Singapore
  • Fast turnaround and delivery schedule