Subsea Umbilical Riser Bases

AME were engaged by Coogee Resources to design two subsea riser bases for their Montara field development project.

AME’s scope of work also included the design and manufacture of the umbilical split clamps and associated riser base interface structures.

Project Profile:

Client:
Coogee Resources
Date:
March - June 2008
Project Duration:
12 weeks
Scope:
Design (conceptual and detailed) and fabrication

Project Summary:

This project presented a unique challenge in that the design could only utilise one specific pre-determined steel member size for all of the primary steel work, as this was the only member available to the overseas fabricator at the time. By incorporating a combination of permanent and removable external ballast weights, all requirements including those of the fabrication restrictions were met successfully.

Download Data Sheet
Website by The Right Group